The CX-Superflow can be run in conjunction with Coretrax plugs and packers to establish a debris-free area for optimal cementing, without the need for a dedicated scraper run.
Setting a bridge plug successfully requires a clean setting area. To achieve this, some operators scrape the setting area before running the plug, which requires an additional trip in and out of the hole.