With the progression of expandable straddles, big bore straddles can now be deployed on wireline, allowing for well integrity issues to be addressed using light intervention vessels.
The Tubing ReLine WL creates a large ID to provide greater access to the wellbore and allow for a maximum production conduit to the surface. The one-trip, rigless device has been developed to allow for stackability which creates a longer, integrated straddle to be deployed, without losing ID.
The tool can be configured to optimise production by selectively eliminating gas, water or sand production with autonomous inflow devices.