Service Tools

Coretrax can provide a full service tool package to our customers including retrievable bridge plugs, retrievable test packers, bumper subs, water bushings and swedges. We hold a wide range of casing sizes and connections of service tools which are manufactured to NS1 and inspected to NS2 standard. Tooling with other manufacture and inspection criteria may be available upon enquiry.

Supporting Equipment

Supporting Equipment

The Coretrax Unloader/Circulating Valve is designed as a high-pressure accessory to withstand severe operating conditions. This Unloader/Circulating Valve provides a means of equalizing tubing and annulus pressures as well as providing a by-pass to allow fluid to pass through the mandrel of the packer while running the tubing string in and out of the well. Circulating can be established to spot fluids to the packer or circulating debris from the hole.

The Coretrax Abandonment Valve provides a means for temporarily abandoning a well without tripping out a workstring. This valve is run in conjunction with a heavy-duty service packer. The Abandonment Valve is designed to allow heavy loads to hang through them and thus allowing a workstring to hang below during abandonment. The most common use of the Abandonment Valve and packer combination is offshore for storm abandonment, but can also be used for working on BOP’s during drilling without tripping the drill string out.

The Coretrax Safety Joint provides a method for backing off a workstring from the tools below using right-hand rotation and reciprocation to back off the release mechanism. The mandrel is locked with shear screws ensuring the back-off mechanism does not occur until required.

We always offer the best solutions for our customers' requirements and never, ever compromise on quality.

-Elliot McDonough

Regional Manager For Middle East

Increasing well productivity and reducing risk for clients around the world. See how.

Case Studies


CX-2 bridge plug and CX-Superflow save Spirit Energy more than two days operating costs CX-2 bridge plug and CX-Superflow save Spirit Energy more than two days operating costs

After producing gas for more than 20 years, Coretrax was contracted by Spirit Energy to…

Double Perf and Squeeze Double Perf and Squeeze

Precise cement placement is integral to successfully abandoning a well and Plug and Perforating provide…

Coretrax Save Operator 18 Hours Rig Time Using CX-tubing Hanger System Coretrax Save Operator 18 Hours Rig Time Using CX-tubing Hanger System

Coretrax was approached to provide a solution for a well abandonment where annular cement had…


View All

Talk to the experts

Get in touch

Complete the form below and we will get back to you as soon as possible

Please let us know your name.
Please let us know your email address.
Invalid Input
Please enter your phone number.
Please let us know your message.
Invalid Input
Invalid Input

Find Us

Our Global Offices

Coretrax Global

Technology House
Moss Road
Gateway Business Park
Aberdeen, UK
AB12 3GQ

+44 (0)1224 872020

enquiries@coretrax.com

Coretrax ME Global FZE

Level 14,
Boulevard Plaza Tower 1,
Sheikh Mohammed Bin
Rashid Boulevard
Downtown Dubai,
PO Box 334036
Dubai, UAE

+44 +971 4 424 5065

MEenquiries@coretrax.com

Coretrax Saudi Arabia

c/o i-Energy
PO Box 7639
Dammam, 34325
Kingdom of Saudi Arabia

+966 (13) 833 0919

KSAenquiries@coretrax.com

Coretrax Malaysia

26th Floor Menara Maxis, KLCC
50088 Kuala Lumpur
Malaysia

+603  2615 7967

enquiries@coretrax.com

Coretrax Kuwait

c/o Alghanim Oil Gas Co.
PO Box 30, Souk Al-Dakhili
Al Rai Area
Kuwait

+965 247 29377/388

MEenquiries@coretrax.com