WBCU Chemicals

Debris and residues left in the wellbore from drilling or production activities can result in reduced productivity or even significant non-productive time (NPT) for the operators. Coretrax wellbore clean up tools are designed to maximize debris recovery from the wellbore and eliminate potential issues further into the well’s lifecycle.

WBCU Chemicals (former Job done. On spec. Well assured)

Every well is unique and our engineered wellbore clean-up services are designed with that in mind. We believe that clean-up services should never be ‘off the shelf.’

We always look at the big picture, answer all your questions and seamlessly combine the following into every job design:

  • An understanding of the well plan and well conditions
  • A design that meets the completion objectives
  • Integration of the mechanical, hydraulic, and chemical parameters
  • Collaboration with other service providers, including drilling, cementing, fluids and other partners

A team of experienced Coretrax engineers run the job, continually monitoring wellbore parameters and assess well conditions in real time, including pressures, active weights, timings, torques and other essential measurements.

During operations, we make sure there is constant contact between onshore/offshore personnel to ensure we can offer our customers a high level of support throughout. Every job is recorded in an end of well report, which includes a record of customer satisfaction against agreed KPIs.  

We always offer the best solutions for our customers' requirements and never, ever compromise on quality.

-Elliot McDonough

Regional Manager For Middle East

Increasing well productivity and reducing risk for clients around the world. See how.

Case Studies


CX-2 bridge plug and CX-Superflow save Spirit Energy more than two days operating costs CX-2 bridge plug and CX-Superflow save Spirit Energy more than two days operating costs

After producing gas for more than 20 years, Coretrax was contracted by Spirit Energy to…

Double Perf and Squeeze Double Perf and Squeeze

Precise cement placement is integral to successfully abandoning a well and Plug and Perforating provide…

Coretrax Save Operator 18 Hours Rig Time Using CX-tubing Hanger System Coretrax Save Operator 18 Hours Rig Time Using CX-tubing Hanger System

Coretrax was approached to provide a solution for a well abandonment where annular cement had…


View All

Talk to the experts

Get in touch

Complete the form below and we will get back to you as soon as possible

Please let us know your name.
Please let us know your email address.
Invalid Input
Please enter your phone number.
Please let us know your message.
Invalid Input
Invalid Input

Find Us

Our Global Offices

Coretrax Global

Technology House
Moss Road
Gateway Business Park
Aberdeen, UK
AB12 3GQ

+44 (0)1224 872020

enquiries@coretrax.com

Coretrax ME Global FZE

Level 14,
Boulevard Plaza Tower 1,
Sheikh Mohammed Bin
Rashid Boulevard
Downtown Dubai,
PO Box 334036
Dubai, UAE

+44 +971 4 424 5065

MEenquiries@coretrax.com

Coretrax Saudi Arabia

c/o i-Energy
PO Box 7639
Dammam, 34325
Kingdom of Saudi Arabia

+966 (13) 833 0919

KSAenquiries@coretrax.com

Coretrax Malaysia

Office 230
Regus Troika
Lot 2-2 Level 2 Tower B, The Troika
19 Pesiaran KLCC
50450 Kuala Lumpur
Malaysia

+603  2178 6111

enquiries@coretrax.com

Coretrax Kuwait

c/o Alghanim Oil Gas Co.
PO Box 30, Souk Al-Dakhili
Al Rai Area
Kuwait

+965 247 29377/388

MEenquiries@coretrax.com